"The World's Most Liveable Town" 2009
Please update your Flash Player to view content.
 
Current Improvement Projects and New Developments
Development Services
Geographical Information System (GIS)
Gibsons Water
Long Range Planning (five years and beyond)
Replacement and Rehabilitation Programs
Short Term Planning (up to five years)
Geoexchange District Energy Utility
Development Services PDF Print E-mail
Usually there are improvements, such as sidewalks, streetlights, and curbing, that are required as a condition of subdivisions or rezoning. The Engineering Department will provide the developer's engineering consultant with such information as as-built plans, contour maps, design specifications and standards, and survey information to assist with the design of the proposed servicing.

ds1pic

Later, staff will review the developer's designs and cost estimates for these services for compliance with the Town’s requirements and standards. The Engineering Department’s staff will complete calculations for the necessary fees and will inspect the works as they are constructed to ensure that they meet proper construction standards and Town bylaws.


Contact Information:

Director of Engineering
Dave Newman

Phone: 604.886.2274
Fax: 604.886.9735
This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Location and Mailing Address
474 South Fletcher Road
Box 340
Gibsons, BC  V0N 1V0

Business Hours
8:00 am to 4:30 pm, Monday to Friday (excluding statutory holidays).